Skip to main content

Lessons Learned

CHECK OUT OUR MOST RELEVANT INCIDENT LISTINGS!

Disclaimer: The Lessons Learned Database includes the incidents that were voluntarily submitted. The database is not a comprehensive source for all incidents that have occurred.

  • Operation and management of the hydrodesulfurization unit should be strengthened to account for abnormal phenomena such as local corrosion.
  • The safety review system for remodeling existing equipment and facilities should be…
  • The fuel cell vehicle that was involved in the accident has been retired. The fuel cell power plant from that vehicle has been removed and is being used in another fuel cell vehicle.
  • The fuel cell vehicle accident reinforced the…
  1. Consider periodic testing of breakaway device.
  2. Consider determining shear force limit of vehicle receptacle adapter fittings.

Many accidents reported from paper mills have much in common with this incident. Microorganisms in the process water with pulp produce hydrogen gas that mixes with air to form an explosive atmosphere. The ignition source is typically sparks…

Although the preparation-for-transport procedures were done the same way they were done for previous outreach programs, this time it proved to be a different situation. It is not clear what caused the ignition of the first balloon, which then set…

Safe storage and transportation of balloons filled with a hydrogen-oxygen mixture is a very risky undertaking. There are few scenarios that do not involve enclosed spaces (e.g., a car) and the potential for static discharge. Perhaps a mesh bag…

The lessons learned from this incident are:

  1. Verify the gas that you are using.
  2. Avoid using "quick-disconnect" fittings in this type of situation. If they are absolutely needed, there are sets available that ensure that…

The investigation team concluded that hydrogen gas was released through a failed 19-inch diameter gasket and ignited under the roof of the compressor shed where it was partially confined. Some gas escaped from the shed prior to the explosion, but…

The investigation determined that hydrogen was formed by the reaction of hot aluminum and water, air was admitted via the inspection door, and the mixture was ignited by the hot clinker or sparks from the chisel. Aluminum should have been…

Procedures for safe handling of compressed gas cylinders, marking design of gas cylinders and connecting lines, and arrangement of cylinders were reviewed and modified as necessary. The spectrometer was returned to the manufacturer for a careful…

In addition to the probable causes listed above, the lack of a standard operating procedure for hydrogen leak detection was one of the probable causes of this incident. Additional contributing factors included the following:
- Severe pipe…

  1. Provide additional retraining of operators. Curriculum should emphasize the proper response to high oxygen in the hydrogen gas.
  2. Evaluate current knowledge of operators. Operators should know…

In the future, the laboratory will issue a memorandum about this incident to illustrate the need to wear safety glasses with side shields, store chemicals compatibly, take care when placing chemicals in the refrigerators for storage, and keep the…

Recommended Actions:

  • The recommended safe storage time for AHF is two years. Contact the vendor for pick up and disposal for cylinders more than two years old. (Unused gas should also be returned, even if it has been less than two…

In any event, the lesson that should be derived from this incident is the fact that the explosion could have been avoided either by using an inert gas instead of air across the diaphragm, or by monitoring the hydrogen concentration in the upper…

This incident illustrates how difficult it is to completely purge hydrogen out of a large, complex piece of equipment. Uniform mixing and dilution is unlikely in all the partially enclosed spaces, crevices, etc. If a hazardous operation such as…

This incident illustrates the danger of hydrogen being inadvertently released through blown water seals. Similar incidents have occurred in non-nuclear industrial facilities, but offgas systems present a special hazard because of the…

The mechanisms and rates by which hydrogen gas is generated and subsequently accumulated in the holding tank need to be fully understood by vendors and employees alike. Active venting, warning signs, and local alarms designed to activate when…

This incident highlights the need to properly design safety interlocks. These safety interlocks need to be carefully incorporated into the initial building/plant designs and should consider all of the unexpected occurrences, such as the…

Personnel should be properly supervised, and supervisors should be aware of the activities of their personnel. Personnel must be motivated to adhere to established policies and procedures. All personnel associated with potentially hazardous work…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire