- Home
-
Resources
- Center for Hydrogen Safety
- Hydrogen Fuel Cell Codes and Standards
- Paper & References
- Web-based Toolkits
- Workforce Development

- Contact
- About H2Tools
The incident occurred during the filling of six bundles of compressed hydrogen cylinders by means of a compressor. Each bundle consisted of 16 cylinders of 40-liter each. When approaching the…
A LH2 trailer was delivering at a customer location. The LH2 transfer had just been terminated and the driver was ready to depressurise the trailer to remove the hose. When he started to open the…
During the preparation for a liquid hydrogen transfer from a tanker to a stationary storage system, the safety valve opened and the gas ignited. The incident occurred when a pressure build-up was…
This incident occurred during the delivery of a hydrogen gas container to a customer site. When a worker turned the protective cap of the container, the valve handle turned together with the…
The incident occurred at the site of a gas production company. During the filling of a compressed hydrogen trailer, an end plug thermal pressure relief device (TPRD) had an unplanned activation.…
A hydrogen leak caused a fireball in in an industrial gas processing and conditioning plant. The leakage occurred at the end of a hose in the packaging station, consisting in filling of tanks…
A liquid hydrogen tanker was preparing to transfer hydrogen to a stationary tank belonging to a manufacturing facility. The tanker was being pressurised before transfer, when a burst disc failed…
The incident occurred while delivering seven compressed hydrogen cylinders to a customer site. The store employee had already removed four cylinders from the delivery truck and carried them…
Near the end of the process of filling a gaseous hydrogen tube trailer at a liquid hydrogen trans-filling station, a safety pressure-relief device (PRD) rupture disc on one of the tube trailer’s…
A hydrogen fire occurred at a hydrogen refuelling station (HRS). The HRS hydrogen storage consisted of two trailers at 200 bar, both connected via flexible hoses to the station delivery system…
A small fire developed at the connection hose between the LH2 delivery trailer and the customer stationary tank. The driver intervened to isolate the hose first on the delivery side, and then at…
We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.