fire on a flexible hose during transfer
A hydrogen fire occurred at a hydrogen refuelling station (HRS). The HRS hydrogen storage consisted of two trailers at 200 bar, both connected via flexible hoses to the station delivery system using a compressor. The incident happened when switching empty trailer(s) with new full one(s). The hydrogen release occurred at the connection between a flexibles hose and the the trailer outlet. A nut part of this connection was damaged and failed when the high-pressure valve of the trailer was opened. The hose was diconnected and sparked the leaked hydrogen, resulting in a fire and injuries to the trailer driver and a HRS operator. Post incident investigation found out that the nut which failed was different, with a thinner neck than the others used for hose connections. The nut failed at the neck under the pressure of the trailer hydrogen, probably due to additional stress caused by a too high tightening force.

The IMMEDIATE CAUSE was the failure of the connection between the flexible hose and the trailer outlet, due to a nut not meeting specification. According to the authors of the article, the ROOT CAUSE was a combination of the following factors: (i) the quality management of the nut quality was along the supply chain, from nut manufacturer to hose producer up to the HRS operator was insufficient. (ii) There was a lack of validated procedures for the fastening of high-pressure hoses. (iii) The consequence of the connection failure was made worse by the lack of an emergency shut-off valve on the hydrogen tube trailer, because it was impossible to stop the supply of hydrogen to the leak.