  • Replace the existing copper and carbon steel hydrogen pipeline with ¾-inch schedule 40 stainless steel.
  • Reroute the new hydrogen line in the preferred location.
  • Locate new hydrogen shut-off valves in a more convenient…

Recommendation 1 - Overhaul and replace the diaphragms on all cells showing low-purity results. Check on a routine basis the individual cell purity levels to monitor the deterioration of performance of individual cells. Certain…

Hydrogen distribution lines should be designed and carefully inspected to ensure process equipment in the area is correctly and safely installed. Equipment subject to vibration should not be placed in contact with hydrogen lines or with other…

  • Metal hydride materials of a composition which is not well characterized should be handled with procedures that assume a "worst case" for that class of materials, intermediates or precursors.
  • Laboratory procedures should be in…

Now, when conducting a sulfur deprivation test, vessels are ventilated to prevent over pressurization and safely facilitate the release of excess hydrogen.

  • One needs to take extreme care with both new and supposedly spent hydride samples; the spent materials may contain pockets of unoxidized alanates that could react violently when being transferred.
  • Work with small samples so if…
  • Valve packing on ammonia tanks should be checked on a regular basis.
  • If an ammonia smell becomes noticeable, the tank should be returned to the supplier.
  1. Flexible tubing should be secured so it cannot get dislodged during operations.
  2. Fume hoods where hydrogen is used should not be made of combustible materials. 3. Preventative maintenance should be performed on equipment on a…
  • Metal hydride materials of a composition which is not well characterized should be handled with procedures that assume a "worst case" for that class of materials, intermediates or precursors.
  • Laboratory procedures should be in…
  • A redundant safety circuit was put into service and the tank returned to normal operation after the failure. Both rupture discs were replaced and the tank was inspected.
  • Important to note that the safety system functioned as…

Hazard analysis should consider potential leak locations, potential ignition sources in the vicinity, and the potential for accumulating flammable gases in that area.

Users should leak-check all cylinders upon installation. This event…

No Lessons Learned, Specific Suggestions for Avoidance, or Mitigation Steps Taken.

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire