  1. The plant tried to increase production and decrease workload, but failed to notice the potential negative outcomes of this change.
  2. It is necessary to thoroughly simulate all potential negative outcomes of a change in procedures.…

Investigation determined that internal galling has caused the failure rendering the needle valve unusable. The galling was caused by a stainless steel stem acting against a stainless steel seat. This failure mode had been observed before and the…

Proper installation of check valves and other equipment should be visually inspected prior to pressurization.

Excessive venting of hydrogen from the tank due to lower facility consumption, in combination with extreme temperature conditions, placed thermal stress on the gland nut, causing a leak. The low consumption of hydrogen resulted from the shutdown…

Included inspection on monthly preventive maintenance plan and evaluated alternate materials for better cold-weather performance.

To prevent a similar flashback, the following measures have been taken:

  1. The valve is opened slowly to avoid a major leading shock into the venting line.
  2. A special nozzle (Laval or similar) is mounted directly after the…

Recommendations:

  1. The using organization should define necessary activities in order to place hydrogen systems in long-term periods of inactivity. The defined activities should address requirements for rendering inert, isolation (i…
  • Active GH2 sensors should be installed and continuously monitored in all enclosed buildings near GH2 sources. All buildings near areas where hydrogen is used should be designed to preclude GH2 entrapment (e.g., sloping roof with…
  1. Follow the rules (e.g., using a torque-amplifying device requires supervisor approval).
  2. Some valves are susceptible to disassembly, with potentially significant consequences, if excessive torque is applied to the handwheel.
  3. …

The following actions were proposed as a result of this incident:

  •  The company in charge of valve calibration and maintenance will be subject to approval of the plant service inspection team.
  •  Plant operating…

Personnel were focused on the AGES system test and results, not the compatibility of the test equipment. The manual valve was needed to successfully test the system, however the fact that this particular valve could not accommodate the full…

An important aspect of the reliability of a valve is the condition of the stem seal which tends to deteriorate with time and wear. Valves used in hydrogen service should be packed with the correct valve packing material and periodically checked…

  1. Maintenance work scopes must be adhered to. If added work is approved, it must be tracked and reviewed to ensure that the equipment is inspected by operations personnel. Scheduled work and extra work should be listed and checked off for…

This occurrence underscores the importance of appropriate design, equipment selection, and design review; the potential drawbacks of sharing utilities with other facilities; and the need to simplify [in this case, glove box atmosphere…

  • Equipment that is designed to provide a safety barrier must be stringently tested upon installation.
  • A procedure requiring annual testing of both excess flow valves, which includes proper seating for closure and proper flow, has…

This occurrence demonstrated the use of data by engineering to evaluate equipment problems. As the data changed, highlighting a problem with one-half inch PVC ball valves, the facility redesigned the valve extension and valve handle to prevent…

Facilities should review their process systems to determine if they have valves installed that may be subject to this hazard. If so, facilities should conduct a detailed hazard analysis to determine the risk of valve failure. Detailed internal…

Installation

  1. Fittings need to be visually inspected to insure ferules are in place and correctly positioned prior to swageing.
  2. Research staff are responsible for communicating system specifications [gas type,…

Hazard assessment is critical during the design, fabrication, and installation of system modifications to ensure hazards and potential hazards are addressed prior to system start-up and operation.

Diligence needs to be practiced when performing assigned work tasks. To guard against complacency, it is necessary to emphasize adherence to established procedures, including appropriate reviews of preventive maintenance instructions (PMI) and…

Key:

  • = No Ignition
  • = Explosion
  • = Fire
Hydrogen Incident Summaries by Equipment and Primary Cause/Issue
Equipment / CauseEquipment Design or SelectionComponent FailureOperational ErrorInstallation or MaintenanceInadequate Gas or Flame DetectionEmergency Shutdown ResponseOther or Unknown
Hydrogen Gas Metal Cylinder or Regulator 3/31/2012
4/30/1995
2/6/2013
4/26/201012/31/1969  3/17/1999
11/1/2001
12/23/2003
Piping/Valves4/4/2002
2/2/2008
5/11/1999
4/20/1987
11/4/1997
12/31/1969
8/19/1986
7/27/1991
12/19/2004
2/6/2008
10/3/2008
4/5/2006
5/1/2007
9/19/2007
10/31/1980
2/7/20091/24/1999
2/24/2006
6/8/1998
12/31/1969
2/7/2009
9/1/1992
10/31/1980
10/3/2008 
Tubing/Fittings/Hose 9/23/1999
8/2/2004
8/6/2008
9/19/2007
1/1/19829/30/2004
10/7/2005
 10/7/2005 
Compressor 10/5/2009
6/10/2007
8/21/2008
1/15/2019
  10/5/20098/21/2008 
Liquid Hydrogen Tank or Delivery Truck4/27/198912/19/2004
1/19/2009
8/6/200412/31/1969 1/1/197412/17/2004
Pressure Relief Device7/25/2013
5/4/2012
1/15/2002
1/08/2007
12/31/1969    
Instrument1/15/20193/17/1999
12/31/1969
2/6/2013
  11/13/73  
Hydrogen Generation Equipment7/27/1999  10/23/2001   
Vehicle or Lift Truck 7/21/2011    2/8/2011
12/9/2010
Fuel Dispenser 8/2/2004
5/1/2007
6/11/2007
9/19/2007
 2/24/2006
1/22/2009
   
Fuel Cell Stack      5/3/2004
12/9/2010
2/8/2011
Hydrogen Cooled Generator   12/31/1969
2/7/2009
   
Other (floor drain, lab
anaerobic chamber,
heated glassware,
test chamber,
gaseous hydrogen
composite cylinder,
delivery truck)
 11/14/1994
7/21/2011
7/27/1999
6/28/2010
8/21/2008
12/31/1969
3/22/2018
  6/10/2019
  • = No Ignition
  • = Explosion
  • = Fire