Hydrogen Refueling Operational Error
When Incident Was Discovered
Severity
Near-Miss
Was Hydrogen Released?
No
Was There Ignition?
No
Equipment
Damage and Injuries
Probable Cause
Contributing Factors
Characteristics
Describe the incident, including corrective steps taken and their result.
Incident Synopsis
While transferring liquid H2 from a tanker, the burst disk ruptured at 50 psi. The pressure limit for the operation was 30 psi.
Cause
The operator turned on the pressure valve and left it unattended, permitting pressure buildup past the allowed 30 psi.
