Control Valve Mishap Leads to Bulkhead Failure
Incident Date
When Incident Was Discovered
Severity
Incident
Was Hydrogen Released?
Yes
Was There Ignition?
Uncertain
Setting
Damage and Injuries
Probable Cause
Contributing Factors
Characteristics
Describe the incident, including corrective steps taken and their result.
The bulkhead between a liquid hydrogen tank and a liquid oxygen tank failed due to a series of events. Air services to the building were shut down for repairs and the facility had switched to an emergency nitrogen supply. Failure to switch back to service air when it became available, led to the mishap.
The emergency supply became depleted and two valves in the normal nitrogen purge system failed in the open position, releasing the high-pressure nitrogen gas from the manifold into the liquid hydrogen tank. The gas flow raised the liquid hydrogen tank pressure to 4.5 psig. That was sufficient to rupture the bulkhead wall.