Skip to main content

HIAD Facility - Application Type: Laboratory / R&D


A burst disc opened prematurely at a research facility, during a hydrogen tube trailer filling operation. The disc failed at 87% (5200 psig, approximately 36 MPa) of the final pressure (6000 psig,…
Malfunctioning of the non-return valve of the hydrogen compressor has caused the pressure between the hydrogen bottle and the compressor to rise to the maximum allowed pressure of 275 barg. As a…
A hydrogen safety sensor went into alarm at a hydrogen demonstration facility. The early morning temperature was near freezing and there was a trace of precipitation on exposed surfaces. Upon further…

The event occurred in a research laboratory on renewable energies and decarbonisation. The Lab Manager had swapped a hydrogen cylinder, together with the delivery personnel. They secured the…

A university lab was investigating the production of hydrogen and methane from biomass made of wooden chips or sawdust. The experimental furnace was a concrete cylindrical furnace of the diameter of…