Hydrogen explosion in a unit of a nuclear power plant.
The explosion occurred while maintenance personnel were grinding a high-pressure injection (HPI) pipe, which had been recently cut at approximately 18 inches from the nozzle connecting the HPI pipe to the reactor coolant system (RCS) piping. The craftsmen, who were grinding on the HPI pipe in preparation for welding, observed a bright flash at the outlet of the HPI line and heard a loud "bang". The craftsman actually performing the grinding was physically blown away from the HPI pipe a distance of about three feet. Personnel in other areas of the containment building heard the explosion and felt the resulting concussion and mechanical vibration. Additionally, some personnel outside of the containment building, including operators in the control room reported that they heard the explosion and felt varying degrees of vibration. Although there were no physical injuries as a result of this event, it should be mentioned that the craftsman's life was endangered as he was working on a scaffold that was over 30 feet high.
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The reason for the presence of an explosive concentration of hydrogen is unknown. It could have been caused by (a) inadequate degassing, (b) failure to purge the HPI pipe with nitrogen, or (c) failure to temporarily plug the open HPI pipe. Subsequent inspection of the affected HPI line, the first upstream check valve in the HPI line, and the corresponding nozzle and safe-end on the RCS cold leg indicated no signs of damage as a result of the explosion.