Failure of the insulation jacket of a pressurisation line (394)

This data is from the European Hydrogen Incidents and Accidents database HIAD 2.1, European Commission, Joint Research Centre.

Failure of the insulation jacket of a pressurisation line

Following loading of propellant run tanks, the insulation jacket (filled with perlite) on the conmon vent and pressurisation line for the LH2 storage tank burst. [Ordin, NASA (1974)]

Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments

The pressure in the jacket increased due to earlier entrance of air due to cryo-pumping, its liquefaction and then expanding liquid. There was a burst disk installed on the jacket, but it failed to relieve due to ice formation. The ROOT CAUSE could be attributed to shortcoming of the design and of regular inspection and maintenance.

Facility Information
Application Type
Application
Aerospace
Specific Application Supply Chain Stage
Components Involved

insulation jacket, vent and presurisation line

Storage/Process Medium
Location Type
Operational Condition
Consequences
Number of Injured Persons
0
Number of Fatalities
0
Environmental Damage
0
Property Loss (offsite)

0

Lessons Learned

This is a rare case of failure to open of a burst disk installed on an insulation jacket. The mode of failure, nevertheless, is common to other events where the burst disk or other pressure relief devices was hindered to activate due to formation of ice.

Event Nature
Emergency Action

none

Release Type
Ignition Source
References
References

Mishap no 56 in P. L. Ordin, Review of hydrogen accidents and incidents in NASA operations, 1974, NASA TM X-71565 https://ntrs. nasa. gov/citations/19740020344

Lowesmith et al. , Safety issues of the liquefaction, storage and transportation of liquid hydrogen: An analysis of incidents and HAZIDS, Int. J. Hydrogen energy (2014) https://doi. org/10. 1016/j. ijhydene. 2014. 08. 002

Hankinson and Lowesmith, Qualitative Risk Assessment of Hydrogen Liquefaction, Storage and Transportation, FCH JU project IDEALHY, Deliverable 3. 10 (2013) confidential (accessed October 2025)