rupture of an expansion joint due to over-pressurisation
During sampling tests on a facility LH2 dock transfer system, the system was pressurized to 15 psig when an expansion joint ruptured. Technicians proceeded with the pressure cycle with the main valve closed instead of in open position as required. Damage to LH2 transfer system. [Ordin, NASA (1974)]
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes

The sampling was performed without checking the main valve which was closed and should have been open. A contributing factor was that personnel performing system repair had closed the main valve without tagging a critical valve. These factors suggest a ROOT CAUSE related to shortcoming in ecexution of a procedure (no pre-test check), agravated by lack of information.