Fire in a refinery
A fire started as a result of an explosion in the process section of a refinery. An open structure of steelwork protected with reinforced concrete housed the usual furnaces, reactors, heat exchangers, storage vessels, overhead pipe racking, pumps and ancillary equipment associated with the refining of crude oils. Also included in the area were three 46m (150 ft. ) high stripping and drying columns built on a concrete base approximately 91m x 21m (300 ft. x 70 ft). The origin of the fire was the rupture of a pipe in a gasoline hydrogen-treating unit; a mixture of superheated naphtha and hydrogen under pressure leaked from the fracture and either exploded on contact with a hot process line or was ignited by static electricity. The fire reached its maximum severity within a few minutes. Plant controllers operated an immediate shutdown but the contents of the many pipes and vessels, which had been superheated and were under high pressure, continued to flow from fractured pipes and distorted flanges cascading burning liquid through the plant. The fracture occurred at a point where the water was injected into the system to improve the flow of materials. The corrosion tolerance was accepted at 1mm (0. 05 in. ) per year but due partly to the presence of corrosive contaminants and an unfavourable flow pattern inside the pipe, corrosion and erosion were much higher than expected, contributing to excessive thinning of pipework, leading to its ultimate failure. The explosion and fire destroyed the stripping and drying columns associated with two hydrogen treating plants and severily damaged other parts of the processing equipment .
Event Date
January 1, 1971
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The INITIATING CAUSE was the failure of a pipe due to unexpectedly high thinning of the pipe wall, due to the combination of internal corrosion and erosion. The ROOT CAUSE is linked to the under-estimation of the corrosion rate of the pipe. It highlights shortcoming in operative and material design knowledge. Moreover, it reveal the lack of (proper) inspection and an underestimation of the related risks in term of severity of consequences.