Explosions in a nuclear power plant
Two hydrogen explosions occurred at a boiling water reactor (BWR). The first explosion occurred at 9:30 a. m. and was mostly confined to the off-gas system. Damage was relatively minor. The second explosion occurred at 13:00 outside the off-gas system in the two-level room at the base of the plant stack. This explosion damaged considerable the stack however, the overall structural capability of the stack was not impaired. One man was injured. The review of the event concluded that the action taken to restore off-gas system drain line loop seals in the stack base space had not been successful. Without these seals, gases from the off-gas system accumulated in the space, resulting in an explosive mixture which was probably ignited by a spark from the level switch in the stack base sump. Inadequate ventilation of the stack base space and the lack of equipment installed to monitor explosive gas concentrations within the enclosed area were concluded to be contributing factors.
Event Date
December 13, 1977
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The INITIATING CAUSE was defective seals in the off-gas system, which allowed release/accumulation of hydrogen outside the system. CONTRIBUTING CAUSES were the inadequate ventilation and the absence of gas monitoring equipment. The ROOT CAUSE could be a combination shortcoming in management, design and possibly also installation/maintenance.