Explosion at a nuclear power plant
The event occurred in the steam condensing line of the residual heat removal system the nuclear reactor. Radiolysis generated hydrogen and oxygen, which then accumulated in high concentration in the pipe. During the periodical manual start-up test of the High Pressure Coolant Injection (HPCI) system, a pressure spike due to pressure fluctuations in the pipe led to ignition, followed by detonation. The pipe burst open and pieces were projected damaging the surrounding structure. Noble metals (Pt and Rh) used to prevent stress corrosion of the lower part of the reactor containment vessel, might have been involved in the detonation, but this is not certain (see discussion in NIT No. 90, among References). According to a simulation of the event by finite element analysis (see Naitoh et al. in references), the detonation pressures in the straight pipes were about 120MPa and the pressure wave propagation speed was approximately 3,000 m/s. The peak pressures at the elbows were 2. 0-2. 5 times higher than those in the straight part of the line, due to reflection and overlapping of the pressure waves. These values at the elbow above the surface of the accumulated water exceeded the critical strain, explaining why the pipe ruptured there. The results were reasonably matching the actual pipe deformation observed after the accident.
The INITIATING cause was the formation of explosive atmosphere in the steam pipe due to radiolysis. The most likely explanation for this is 1. Formation of hydrogen by radiolysis of reactor water in a core. 2. Hydrogen accumulated in the pipe. 3. Hydrogen detonation, triggered by a pressure wave. As to the pipe failure: the fact that the geometry of the steam condensing line as modified in the year 1993-94, introducing horizontal sections has certainly caused the presence of strain-stress concentration and the bending. This may hint at a inadequate risk assessment or shortcoming in the design.
We are professional and reliable provider since we offer customers the most powerful and beautiful themes. Besides, we always catch the latest technology and adapt to follow world’s new trends to deliver the best themes to the market.
Contact info
We are the leaders in the building industries and factories. We're word wide. We never give up on the challenges.