Overpressure damage in a testing facility (397)

This data is from the European Hydrogen Incidents and Accidents database HIAD 2.1, European Commission, Joint Research Centre.

Overpressure damage in a testing facility

During a leak check of a flash point material testing chamber, the chamber was inadvertently over-pressurised with GH2. The glass port in the door burst, causing damage to the chamber and to the facility. [Ordin, NASA (1974)]

Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments

The ROOT CAUSE was design deficiencies in the test chamber and installation. The pressure source was 150 psig (11 bara) and the chamber working pressure was 16. 5 psia (0. 4 bara). There was no pressure regulator on the source and no pressure relief valve on the chamber. The pressure gauge was installed between two chambers with shutoff valves to each, thus allowing erroneous pressure readings under dynamic pressure conditions. CONTRIBUTING CAUSE was a failure to follow procedures in checking leaks.

Facility Information
Application Type
Application
material testing
Specific Application Supply Chain Stage
Components Involved

testing chamber

Storage/Process Medium
Actual Pressure
1
Design Pressure
0
Location Type
Operational Condition
Consequences
Number of Injured Persons
0
Number of Fatalities
0
Environmental Damage
0
Property Loss (offsite)

0

Event Nature
Release Type
Release Substance
H2 100%
Hydrogen Release Concentration (%)
0.00
Ignition Source
References
References

Mishap no 57 in P. L. Ordin, Review of hydrogen accidents and incidents in NASA operations, 1974, NASA TM X-71565 https://ntrs. nasa. gov/citations/19740020344

Lowesmith et al. , Safety issues of the liquefaction, storage and transportation of liquid hydrogen: An analysis of incidents and HAZIDS, Int. J. Hydrogen energy (2014) https://doi. org/10. 1016/j. ijhydene. 2014. 08. 002

Hankinson and Lowesmith, Qualitative Risk Assessment of Hydrogen Liquefaction, Storage and Transportation, FCH JU project IDEALHY, Deliverable 3. 10 (2013) confidential (accessed October 2025)