Manual venting from a LH2 tanker in transit
While returning to the base, a liquid hydrogen tanker had to be vented twice. The cause of the overpressure was a malfunctioning scale which allowed a slight overload of hydrogen. [Zalosh and Short, 1978]
Event Date
January 27, 1976
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences

The INITIATING CAUSE was the build-up of pressure inside the tank, which forced to manual venting. ROOT CAUSE was The cause of the overpressure was a malfunctioning scale which allowed a slight overload of hydrogen.