Hydrogen release from a reactor of a pharmaceutical plant

A hydrogen detector located above the hydrogenation reactor tripped in a pharmaceutical plant. The internal emergency plan was activated and the personnel evacuated. The operator did not notice any anomaly, except for the faulty hydrogen sensor. Two hours later, the emergency plan was partially cleared. The hydrogenation plant was shut down for the weekend. The 2 sensors were checked. Following investigations, it was found that the event was due to a hydrogen leak at the level of the spindle seal of the hydrogen supply valve of the hydrogenation reactor located at 3 different places. This leak was not detected during the pressure tests because the tests were not fit-for-purpose: the hydrogen valve was closed, the detectors were far from the hydrogen bottles rack, they were activating only on double detection and not on a single sensor, and the sensors wiring was not properly done. [ARIA event 57243]

Event Date
October 10, 2020
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments

The INITIATING CAUSE was a leak on the seal of the hydrogen supply valve. This leak was not noticed, because the operator noted only the tripping of the detector. The ROOT CAUSE was the failure of the procedure aiming at testing the detection systems: this procedure was not fit-for-purpose: the hydrogen valve was closed, the detectors were far from the hydrogen bottles rack, they were activating only on double detection and not on a single sensor, and the sensors wiring was not properly done. This can be attributed to Job and management factors

Facility Information
Application Type
Application
Pharmaceutical production plant
Specific Application Supply Chain Stage
Components Involved

seal, supply valve

Storage/Process Medium
Location Type
Operational Condition
Consequences
Number of Injured Persons
0
Number of Fatalities
0
Environmental Damage
0
Post-event Summary

The operator initially failed in understanding the emergency, because reacted on sensor tripping, not recognising the existence of a leak. Nevertheless, the internal emergency plan was activated and the personnel evacuated. Two hours later, the emergency plan was partially cleared. The hydrogenation plant was shut down for the weekend.

Event Nature
Emergency Action

The internal emergency plan was activated and the personnel evacuated.

Release Type
Release Substance
H2 100%
Hydrogen Release Concentration (%)
0.00
Ignition Source
References
References

ARIA Event 57243 https://www. aria. developpement-durable. gouv. fr/accident/57243/ (accessed July 2023)