Hydrogen release from a reactor of a pharmaceutical plant
A hydrogen detector located above the hydrogenation reactor tripped in a pharmaceutical plant. The internal emergency plan was activated and the personnel evacuated. The operator did not notice any anomaly, except for the faulty hydrogen sensor. Two hours later, the emergency plan was partially cleared. The hydrogenation plant was shut down for the weekend. The 2 sensors were checked. Following investigations, it was found that the event was due to a hydrogen leak at the level of the spindle seal of the hydrogen supply valve of the hydrogenation reactor located at 3 different places. This leak was not detected during the pressure tests because the tests were not fit-for-purpose: the hydrogen valve was closed, the detectors were far from the hydrogen bottles rack, they were activating only on double detection and not on a single sensor, and the sensors wiring was not properly done. [ARIA event 57243]

The INITIATING CAUSE was a leak on the seal of the hydrogen supply valve. This leak was not noticed, because the operator noted only the tripping of the detector. The ROOT CAUSE was the failure of the procedure aiming at testing the detection systems: this procedure was not fit-for-purpose: the hydrogen valve was closed, the detectors were far from the hydrogen bottles rack, they were activating only on double detection and not on a single sensor, and the sensors wiring was not properly done. This can be attributed to Job and management factors