Hydrogen release from a CGH2 trailer (1153)

This data is from the European Hydrogen Incidents and Accidents database HIAD 2.1, European Commission, Joint Research Centre.

Hydrogen release from a CGH2 trailer

The burst disc activated prematurely on a small hydrogen tube trailer. The pressure at which the activation occurred was between 80 and 100 bar (1200 and 1500 psig). The design activation pressure at which these burst discs activate is approximately 230 bar (3300 psig). The entire tube trailer emptied through the single rupture disc as the tubes were interconnected. No one was hurt, no equipment was damaged, and no fire resulted. The investigation discovered that vent pipe of the storage tube relief device of each tube did not have weather caps on their outlets, as required. The cause of the incident was water which got into the vent pipes and froze, deforming the rupture disc. The deformation caused the disc to open prematurely between 1200 and 1500 psig. The biggest contributing factor was that the ambient temperature had dropped to -10 C (15 Deg F), very unusual for this area.

Event Date
January 1, 2024
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments

The INITIATING CAUSE was the premature activation of the burst disc due to environmental damage. A CONTRIBUTING CAUSE was the very low ambient temperature, atypical for the area. The ROOT CAUSE was the failure to follow the operating procedures. This could be attributed to a human failure, but also to shortcoming in the verification of the execution of the procedures.

Facility Information
Application
CGH2 tube trailer
Specific Application Supply Chain Stage
Components Involved

burst disc

Storage/Process Medium
Actual Pressure
10
Design Pressure
20
Location Type
Location description

DESCRIPTION OF THE UNIT The trailer had multiple tubes on the chassis. Each tube was equipped with a burst disc connected to an individual vent pipe. The source does not provide data on the number of the tubes and the quantity transported

Operational Condition
Consequences
Number of Injured Persons
0
Number of Fatalities
0
Environmental Damage
0
Post-event Summary

The hydrogen cotnained I nthe affected tube was lost.

Lessons Learned

The H2TOOLS report provide as lesson the need to follow CGA G-5. 5 vent end system designs. The CGA G-5. 5 is a CGA "Standard for Hydrogen Vent Systems", applicable in the US.

Event Nature
Emergency Action

None

Release Type
Release Substance
H2 100%
Hydrogen Release Concentration (%)
0.00
Ignition Source
References
References

H2TOOLS report https://h2tools. org/lessons/tube-trailer-vent-system-ice-plugged-frozen (accessed January 2025)