Explosion on a hydrogen compressor of a silane manufacturer
An explosion occurred at a hydrogen compressor of a polysilicon plant. The head of the compressor was blown off and the released hydrogen exploded causing extensive damage to the building and to surrounding piping and equipment. The consequence was the release of Trichlorosilanes (TCS). This compound converts to hydrochloric acid (HCl) when released into the atmosphere. It was estimated that approximately 1,784 pounds of HCL were released during the event (5000 pounds is the maximum legally allowed). Two employees were light injured as a result of firefighting activities. The compressor had been revamped by installing a new 24-inch head piston with a 24-inch piston. The new piston failed during operation. The detailed series of events: 7 September, 3:47 PM equipment failure in the compressor room of the hydrogen recovery building. The piston in one of the cylinder failed and allowed hydrogen gas to enter an adjoining variable frequency drive room. The control room operator stopped the process and halted the flow of process gasses to the compressor. 7 September, 4:00 PM the hydrogen gas that had entered the variable frequency drive room was ignited by an electrical component, resulting in an explosion and subsequent fire. The company firefighter teams were deployed. 8 September, 4:00 AM, emergency response activities were completed.

The INITIATING CAUSE was the mechanical failure of the piston of one of the hydrogen compressor cylinders. The administration in charge concluded that the incident was due to a “sudden and unavoidable failure of process equipment” and classified it as malfunction. In this case, the ROOT CAUSE would be the same as the immediate cause. However, the fact that the new piston failed after only 127 days of operation suggests that something went wrong during the manufacturing or design phase