Release from an underground hydrogen pipeline
A pipe of a hydrogen storage system (240 m³) breaks. The staff is evacuated and a perimeter of protection is put in place.
Event Date
January 28, 1988
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes
