Release of hydrogen from a gas pipe in a refinery
During a stop of the operations for maintenance and repairs, a worker was cold-cutting a hydrogen piping supposedly purged before. This caused a release of hydrogen. Realising this, the worker stopped the air saw and gave an alert. The installation was put in safe mode. The thousand employees presented was confined A solid plug was installed to isolate the section affected by the leak.
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The incident was caused by an error in identifying the location of the purge valve to be cut. A preparatory site visit had been conducted a few months earlier between the subcontractor in charge of the work and the subcontractor responsible for its preparation. A photograph was used, in addition to isometric drawings, to locate the installations. However, the photograph used did not depict the correct purge valve but its mirror image with respect to a manifold. The label marking the location of the intervention was then placed on a hydrogen pipeline that was in operation. Pre-work checks and verifications, focused on energy isolation, failed to detect this error. There was no on-site meeting between the contractor and the operator before work began. The ROOT CAUSE can be identified in shortcoming in the procedures regulating the preparatory work and the management between plant operator and contractors in charge of the repair/maintenance works. It was not only about procedures, but also about involvement of the site management in assuming responsibilities towards contractors and ensuring correct communications.