Release in a chemicals plant
A hydrogen leak alarm was received in the control room from the reformer of the hydrogen plant of a chemicals manufacturing facility. The reformed was depressurised and the leak stopped. The leak was reported to the duty officer and nitrogen flushing was started in the reformer. The leak, a 15 mm rupture at the bottom of the tank, was located in a couple of hours. From measurements performed after the nitrogen flushing, hydrogen was still found to be present in the tank, apparently having been left in the catalysts and inside the pocket on the upper section of the tank. The top flange of the tank was opened and nitrogen flushing was continued from below with a hose.
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes
Cause Comments
The INITIATING CAUSE The was a crack at the bottom of the reformer tank. No details are provided, able to identify a ROOT CAUSE.
