Skip to main content

Over-pressurisation of a LH2 tanker (63)

This data is from the European Hydrogen Incidents and Accidents database HIAD 2.1, European Commission, Joint Research Centre.

Over-pressurisation of a LH2 tanker

A liquid hydrogen tanker was returning almost empty to the base terminal. The drivers noted a pressure rise in the tanker stopped at a remote area of a rest area and performed a controlled venting. It was determined they had not properly stabilised the tank internal pressure before leaving the customer site. The vehicle was thoroughly inspected prior to its next dispatch.

Event Date
July 26, 1990
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes
Cause Comments

INITIAL CAUSE was over-pressurisation of the tank during the journey. The ROOT CAUSE was the failing to successfully perform stabilisation of the tank after delivery.

Facility Information
Application
LH2 tanker
Specific Application Supply Chain Stage
Components Involved

over-pressure

Storage/Process Medium
Storage/Process Quantity
3483
Location Type
Operational Condition
Pre-event Summary

The tank stabilisation procedure had not been performed properly after the transfer of the liquid hydrogen.

Consequences
Number of Injured Persons
0
Number of Fatalities
0
Environmental Damage
0
Currency
Property Loss (onsite)

300

Property Loss (offsite)

0

Post-event Summary

No loss is reported

Event Nature
Emergency Action

The drivers performed a stabilisation procedure on the highway.

Release Type
Release Substance
H2 100%
Hydrogen Release Concentration (%)
0.00
Ignition Source
References
References

Event incident ID I-1990080589 of the PHMSA database (Pipeline and Hazardous Materials Safety Administration, 1996), https://portal. phmsa. dot. gov/analytics/saw. dll?Portalpages (accessed September 2024)