Over-pressurisation of a LH2 tanker
A liquid hydrogen tanker was returning almost empty to the base terminal. The drivers noted a pressure rise in the tanker stopped at a remote area of a rest area and performed a controlled venting. It was determined they had not properly stabilised the tank internal pressure before leaving the customer site. The vehicle was thoroughly inspected prior to its next dispatch.
Event Date
July 26, 1990
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes

INITIAL CAUSE was over-pressurisation of the tank during the journey. The ROOT CAUSE was the failing to successfully perform stabilisation of the tank after delivery.