Near miss at a LH2 fill station
At an off-site LH2 fill station, a LH2 trailer hit the GH2 purge shut-off valve handle. The tubing attached to the purge valve was bent on both ends but did not leak. [Ordin, NASA (1974)]
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes

The INITIATING CAUSE was a small collision causing a damage to a valve. The ROOT CAUSE was the fact that the driver was not sufficiently careful in approaching the LH2 system fill point.