Failure on the pump of a hydrogen tanker
A dual phase hydrogen tanker was expected to refill the storage of a refuelling station for buses. Due to the failure of the a bolt of the tanker pump, the refuelling could not take place. This resulted is that buses were unable to fuel for 3 days and loss of operations during this window. The faulty bolt was replaced.
Event Date
August 23, 2013
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes
Cause Comments
A breakdown on the liquid to gas elements on the dual phase hydrogen trailer, resulting from a bolt failure on the pump