Explosion at a methanation reactor
The day before the incident, the outlet pipe connected to methanation reactor started leaking gas, which contains hydrogen. The leak was temporarily eliminated by a pressurised plug. On the day of the incident, the pipe leaked again, and the same plugging method was still used to stop the leak. This occurred without shutting down the unit and taking safety measures. Approximately one hour later, a sudden explosion occurred at the inlet line of the methanation reactor. The welded joint of outlet pipes that connected to the methanation furnace was operating for a long time in the high temperature hydrogen containing medium. Under this condition, hydrogen embrittlement took place, producing local defects and eventually opening up. The released hydrogen ignited and exploded.
Event Date
April 23, 2011
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The INITIATING CAUSE was hydrogen corrosion which CAUSEd a crack and a gas release. Attempts to stop the leak by temporary measures were executed without stopping the operations and no additional safety measures being put in place were definitively part of the root CAUSEs. According to the source (See reference), the company did not implemented the safety operation procedures prescribed by the "Pressure Pipeline Management Regulations", and specifically the "Special Equipment Safety Technical Specifications" (TSG D0001-2009 Pressure Pipeline Safety Technical Supervision Regulations-Industrial Pipelines) and "General Specifications for Standardization of Hazardous Chemical Business Units" (AQ3013-2008).