A release occurred from a high-pressure hydrogen storage vessel at a hydrogen refuelling stations. Immediately after detection, hydrogen was vented out as a safety measure. There was no injury, fatality or property damage. For the investigation, the vessel was disassembled, and found that there were significant differences in thread length between the plug and the neck, and that the O-ring and the back-up ring had ruptured. The structural analysis for the neck assembly demonstrated that the metal parts were designed with sufficient strength but the force on the back-up ring lead to plastic deformation and rupture.
Event Date
August 4, 2020
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences

The INITIATING CAUSE was the rupture of an O-ring. The ROOT CAUSE was probably related to an installation of the end plug of the vessel which damaged the O-ring.