Release from a hydrogen pipeline
During maintenance work on a gas pipeline carrying hydrogen , a worker hears a leak at about at a bridge. The operator measures an concentration of 3% of the low flammability limit at few centimetres from the leak, and no detection beyond 25 cm. The area was highly ventilated. The technicians secured the area, isolated the section five hours later and started the controlled gas release. after two additional hours the pressure had reduced to zero and they started the nitrogen inerting. The pipe was repaired the next day.
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes