Release and fire from a hydrogen pipeline
Release from a welding of a hydrogen transmission pipeline At 12:45 pm the operation control centre (OCC) recognised that a customer flow and pressure dropped significantly. At 13:28 the OCC made the decision to close the upstream remote operated valve. At 15:00 the pipeline technician arrived on site and confirmed the breach in the pipeline. Additional pipeline operations technicians were deployed to isolate both manual block valve upstream and downstream of the incident site.
Event Date
February 5, 2022
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The initial cause was the complete failure of a pipe girth weld, probably at the heat-affected zone, by hydrogen induced cracking.