Release and fire at a flexible hose during hydrogen transfer

A hydrogen leak occurred at a tube bundle container at the loading and unloading bay of a PSA (Pressure Swing Adsorption) hydrogen production plant. During the hydrogen filling process, a worker in charge noticed the leak in the filling hose of one of the trailers after an abnormal noise. After 22s, the hose connected to that trailer broke, and moved rapidly towards another trailer. less than 5 minutes later, the broken hose was flung in front of the other trailer and the leaking hydrogen gas started to burn. After only 5s, the hydrogen leaking from the loading and unloading ports on first trailer caught fire and burned. The metal hose fractured, the hose was flung around, and hit an object, which caused the spark which ignited the hydrogen. This is a case of delayed ignition: from the moment in which the hydrogen leak was detected to the first ignition took 5 minutes. The fire resulted in damage to the pipes, valves and other accessories of the two hydrogen bundle containers.
Event Date
July 30, 2020
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
the INITIATING CAUSE of the fire was the rupture of a flexible filling hose. The hose could not meet the working pressure of 22 MPa, the hose ruptured when it reached 17. 473 MPa and then broke off, causing a direct leak of hydrogen. The company bought and used metal hoses produced by a machinery fittings manufacturing company. They were cheap and burst when they were filled to 7. 5MPa pressure. This reveals that the enterprise's quality and safety awareness was not strong, the risk assessment was not thoroughly performed, the control and the mitigation measure was not in place or not well-designed.
Facility Information
Application
CGH2 tube trailer
Specific Application Supply Chain Stage
Components Involved
flexible, trailer
Storage/Process Medium
Actual Pressure
17
Design Pressure
7
Location Type
Operational Condition
Consequences
Number of Injured Persons
0
Number of Fatalities
0
Post-event Summary

A small economic loss. No injuries.

Lessons Learned
The investigation found the company was using cheap flexible which were not designed for the pressure used during hydrogen transfer. This reveals that the enterprise's quality and safety awareness was not strong, the risk assessment was not thoroughly performed, the control and the mitigation measure was not in place or not well-designed. The consequence of the incident could have been much higher, if the hydrogen would have cumulated in the semi-confined structure neighbouring the trailers. This could be an example of neglecting basic safety engineering principles to abate cost.
Event Nature
Emergency Action
The emergency measures were taken effectively. The fire was completely extinguished approximately 1 hour after its start.
Release Type
Release Substance
H2 100%
Hydrogen Release Concentration (%)
0.00
Ignition Source
Detonation
No
Deflagration
No
High Pressure Explosion
No
High Voltage Explosion
No
References
References

Investigation Report on the "7-30" General Leakage and Fire Accident at Dongguan Juzhengyuan Technology Company Limited, Lixia Island, Shatian Town, Dongguan City.

B. Wang et al. , Hydrogen related accidents and lesson learned from events reported in the in east continental Asia,#2023, ICHS-2023