Malfunctioning in a hydrogen refuelling station
At a refuelling station for buses, the first dispenser had been taken out of operation, because leaking (see HIAD event 403). Another dispenser was being used. Fuelling was taking too long and was very slow. The producer was called and it was found that the solenoid valves were not opening correctly due to a lack of compressed air.
Event Date
July 23, 2013
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes
Cause Comments
It was found that a snap connector on an air line in the fuel cell workshop had come apart overnight. The air supply was restored and fuelling took place normally so that no buses were delayed for service. Before the workshop was locked up there was no indication that the near miss would occur. Investigation found that the connector was fitted with the correct crimp.