Leak at the generator of a nuclear power plant
A leak started on the hydrogen coolant cicrcuit of one of the power generators of the plant. It was indirectly detected because f the increased need to generate new hydrogen for cooling and it kept growing in the following days. After attempts to isolate the leak, the opetator decidedto shutdown theturbine-generator unit and replaced all the hydrogen coolers. This is a more detailed sequence of events: 28 August - First signal of an increased make-up rate of hydrogen cooling gas to the main generator. The normal make-up rate of hydrogen was approximately 600 standard cubic feet per day (SCFD). This increase was an indication of hydrogen losses due to a leak. Technicians sampled areas of the turbine building confirming absence of an explosive mixture. They verified through periodic tours of the turbine building that no welding, cutting, or grinding was being conducted that could result in an ignition source for any potential hydrogen concentration build-up in the turbine building. 10 September - Make-up rate of hydrogen increased to approximately 4,000 SCFD by September 10, 2002. The operator tried unsuccessfully to isolate the hydrogen cooler suspected to leak. 11 September - After unsuccessful attempts to isolate the hydrogen leak, the operator decided to take the unit off-line to implement a repair. , The power was reduced to approximately 10% and the generator was taken off-line. 13 September - All four generator hydrogen coolers were replaced, and the unit was restored to full power operations.