Leak from a CGH2 trailer during delivery
This incident occurred when delivering hydrogen to a stationary hydrogen tank at a customer site. After transferring from the first 2 tubes, the driver began to transfer from the 3rd tube. At this point, a fitting failed on the customer tank. A 1/2" tube separated from the fitting causing a leak. The leak lasted about 5 minutes until the pressure dropped and the driver was able to isolate the leak and stop the flow.
Event Date
October 26, 2019
Record Quality Indicator
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Causes

The INITIATING CAUSE was the failure of a connection pipe on the stationary storage tank, when transferring. The ROOT CAUSE is unknown