Skip to main content

Explosion in the hydrogenation reactor of a food products plant (926)

This data is from the European Hydrogen Incidents and Accidents database HIAD 2.1, European Commission, Joint Research Centre.

Explosion in the hydrogenation reactor of a food products plant

Explosion in a food products plant (Seveso classified) The event occurred in the settling cyclone of a hydrogenation reactor of a starch production unit. The process consisted in introducing the starch hydrolysate mixture into the reactor with a catalyst (Raney nickel), under agitation and 50 bar of hydrogen at 130°C. The reaction lasted three hours, after which hydrogenated mixture was racked and decanted before purification. The explosion occurred during the discharge of the reactor into the settling cyclone. These operations took place 6 to 8 times a year. The ARIA report (see references) does not state with certainty the cause(s), but mentions the opinion of the plant operator, that the explosion was possibly due to the presence of hydrogen in the settling tank. This would indicated the existence of a leak due to a welding defect in part of the reactor containing the gaseous phase.
Event Date
September 18, 2014
Record Quality Indicator
Region / Country
Event Initiating System
Classification of the Physical Effects
Nature of the Consequences
Cause Comments
The INITIATING cause, assuming correct the analysis of the plant operator, was the hydrogen leak from the reactor to the cyclone through a welding degradation.
Facility Information
Application Type
Application
Food production
Specific Application Supply Chain Stage
Components Involved
starch hydrogenation reactor, settling cyclone
Storage/Process Medium
Actual Pressure
5
Design Pressure
5
Location Type
Location description
DESCRIPTION OF THE PROCESS A settling cyclone is a type of dusk collector/removal. (Hydrogenated) starch hydrolysates are mixtures of several sugar alcohols.
Operational Condition
Consequences
Number of Injured Persons
0
Number of Fatalities
0
Lessons Learned
The ARIA report (see references) does not mention improvement actions undertaken after the explosion. Assuming correct the proposed explosion cause, a hydrogen leak via a (growing) welding defect, the most logic lesson learnt would be to improve inspection procedures for a better control of welding and assessment of the overall tightness of the hydrogenation reactor.
Event Nature
Release Type
Release Substance
H2 100%
Hydrogen Release Concentration (%)
0.00
Ignition Source
Detonation
No
Deflagration
No
High Pressure Explosion
No
High Voltage Explosion
No
References
References

Event description in the French database ARIA https://www. aria. developpement-durable. gouv. fr/accident/45736/ (accessed September 2020)