Skip to main content

FAQ

The most common means to warm liquid or cold gaseous hydrogen is the use of ambient air vaporizers using ambient atmospheric. Other means can be through the use of electric heat or process waste heat.  

Category: System Design

The pressure regulator controls the liquid flow from the tank to the pressure build (PB) vaporizer. As the tank pressure falls, the pressure regulator opens. When the set pressure of the regulator is reached, then the regulator closes. The pressure build circuit depends largely on the required use pressure and the system house-line pressure drop, which is driven by peak flow rate, pressure,…

Category: System Design

A pressure gauge is not usually provided, as one set of devices (safety valve and rupture disc) is always online by design. If the diverter valve connecting the two sets of relief devices is in the center position, both sets are online although depending upon the design of the diverter valve, it might not allow full flow in either direction. For the secondary stack with a rupture disc and a…

Category: System Design

As is mentioned in the question, it should always be assumed that vent stack fires will occur. The vent stack must be designed to withstand a possible deflagration and the heat from a continuous vent stack fire. The stack should also have sufficient height and be located such that thermal radiation is safe for surrounding personnel, equipment, and buildings. The codes and standards have…

Category: System Design

Refineries and large petrochemical plants will frequently have flare systems for H2 and other flammable materials. One of the major purposes of these flare systems is to prevent a large unignited cloud from forming since that could result in an explosion hazard and large deflagration overpressures if there is a delayed ignition. However, these are in large facilities which have the…

Category: System Design

The HSP recommends against the use of glycols for pressure tests due to the difficulty of adequately removing all glycol that might be left in a system after a hydrotest. The HSP recommends a pneumatic test at 110% of the system maximum allowable working pressure (MAWP), which is acceptable by code. Due to an increased danger with pneumatics vs hydrotesting, establish a pressure test zone for…

Category: Piping

The Panel recommends performing a pressure test at 110% of design pressure. This requirement should be applied to all systems regardless of construction type since the intent is to ensure pressure integrity and proper installation. All fitting types have modes of failure during installation. For example, there are numerous examples where compression fittings have had ferrules installed…

Category: Piping