Skip to main content

FAQ

The requirements of the code used for the original construction apply. The piping may meet the requirements of more than one code. In which case, the code used for changing the rating may be different than the original code of construction. In any case, the re-rated system should meet all of the requirements of the selected code. Note that if the original proof test of the system was…

Category: Piping

The code used for repair and alterations of an existing system depends on the code used for construction as well as on the requirements imposed by the jurisdiction. Note that getting a permit from the jurisdiction may be necessary for an extensive alteration.

Code of ConstructionGenerally Accepted Code for Repair and Alterations…
Category: Piping
Keywords: Piping, Codes

The Hydrogen Safety Panel is not aware of any detailed guidelines or requirements. There are general requirements for personal protective equipment (PPE) in relevant codes and standards, but these often defer to the manufacturers requirements or a material safety data sheet (MSDS) for specifics. Ultimately, PPE selection is a matter between the employer and the employee and may need to…

The UN ECE R134 regulation is a good requirement to follow as it copies the language in the UN GTR #13 regulation. The updated version of this UN document (UN GTR #13 Phase 2) is currently in approval review at the GRSP in Geneva and should be approved by the end of 2023. Nevertheless, since the US Department of Transportation’s National Highway Traffic Safety Administration is a contracting…

The HSP recommends against the use of glycols for pressure tests due to the difficulty of adequately removing all glycol that might be left in a system after a hydrotest. The HSP recommends a pneumatic test at 110% of the system maximum allowable working pressure (MAWP), which is acceptable by code. Due to an increased danger with pneumatics vs hydrotesting, establish a pressure test zone for…

Category: Piping

The Panel recommends performing a pressure test at 110% of design pressure. This requirement should be applied to all systems regardless of construction type since the intent is to ensure pressure integrity and proper installation. All fitting types have modes of failure during installation. For example, there are numerous examples where compression fittings have had ferrules installed…

Category: Piping